Hi again. Currently it is working. I defined the Number of profiles for each day to be 2 in the parameter part of the type 41. Then, it has stated to operate between specified points.
That was the key part. Thanks for your help.
I have an other question about my Project for type 56 building model. Although everthing seem to be normal for airnodes such as temperature, relative humidity, the sensible and latent energy demands of the airnodes (the outputs of type
56) equals to always zero. Should I define something special here? Do you or does anyone have an idea about this case ?
Thanks in advance.
HG Ozcan
From: Hüseyin Günhan Özcan
Sent: Wednesday, April 8, 2020 4:42 PM
To: Jeff Thornton <thornton@tess-inc.com>; TRNSYS users mailing list at OneBuilding.org <trnsys-users@lists.onebuilding.org>
Subject: RE: [TRNSYS-users] About scheduling
Dear Jeff,
Thanks for your help. However, type 922c operates always on althogh I defined the types 14 and 41 together with the type 108 signals outputs by using an equation. Than, I connected them to conditioning signals of each 5 stages.
Can it be beacuse of proforma definition for type 41?
Regards,
HG OZCAN
If the control signal to the equipment is a function of both time of day/ year and a thermostat then the input should reflect that. Use an equation and multiply the on/off signal from your forcing function by the on/off signal from your
thermostat. Then use that value (only on when both are satisfied) as the inputs to fans, pumps, equipment etc.
Jeff - TESS
Hello everyone,
I hope you are all doing well and healthy.
I am modeling a PV powered air conditioner unit with back up system. My model cuurently operates. However, I am also planing to switch off the air conditioner between 18:00 to 08:00 on weekdays and also at the weekends.
I tried to use type 14 (weekdays and weekend defination) with type 41 (whole week). But I could not find the connection for output of type 41, namely forcing function output for current day. I suppose that they have to be connected to fan
control signal, mass flow rate or conditioning signals. But they are all connected to other models like building and termostat.
Can you please help me on this issue?
Best regards.
Res. Assist. Huseyin Gunhan Ozcan
Yasar Uni. Dept. of Energ. Sys. Eng.
Bu elektronik postada bulunan tum fikir ve gorusler ve ekindeki dosyalar sadece adres sahip/sahiplerine ait olup,
Yasar Universitesi bu mesajin icerigi ile ilgili olarak hic bir hukuksal sorumlulugu kabul etmez. Eger gonderilmesi
dusunulen kisi veya kurulus degilseniz, lutfen gonderen kisiyi derhal haberdar ediniz ve mesaji sisteminizden siliniz.
The information contained in this e-mail and any files transmitted with it are intended solely for the use of the
individual or entity to whom they are addressed Yasar University does not accept legal responsibility for the
contents. If you are not the intended recipient, please immediately notify the sender and delete the message from your system.
|
_______________________________________________
TRNSYS-users mailing list
TRNSYS-users@lists.onebuilding.org
http://lists.onebuilding.org/listinfo.cgi/trnsys-users-onebuilding.org