Dear TRNSYS users, Does anyone know how to increase the maximum allowable number of equations in TRNSYS? I understood from a previous TRNSYS discussion that the problem is that I exceeded the number of allowable operators rather than the number of equations especially that I am simulating a certain process at different operating conditions
using polynomial equations so there are lots of operators (and equations as well). Thank you Regards, Amir Nashed PhD Candidate School of Renewable Energy and Photovoltaic Engineering University of New South Wales Phone:+61405979282 Email:a.nashed@unsw.edu.au |