[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[TRNSYS-users] variable time step?
I'm at a conference this week and someone mentioned using a variable time step in simulations (not TRNSYS) and I was wondering if this was possible in TRNSYS.
I know you can make the time step a variable in the deck.
I could see using this if you want to carefully control startup and shutdown of a device, but while the device is running or not running, you could have a larger time step. This would speed up the overall run time.
It would probably play havoc on the printegrator.
Just wanted to start a discussion about this topic to see if it's been done successfully and when.
Fred
FRED BETZ PhD., LEED AP
SUSTAINABLE SYSTEMS ANALYST
AEI | AFFILIATED ENGINEERS, INC.
5802 Research Park Blvd. | Madison, WI 53719
P: 608.236.1175 | F: 608.238.2614
fbetz@aeieng.com | www.aeieng.com