Hello again, Is it possible that someone
recompile the trndll.dll for me because I am stuck with this big project? I saw that the
nMaxOutputs is fixed to 3000. Is it possible to increase it to 10000 ? My trnsys version is
: 16.01.0003 And Simulation Studio
version is : 4.2.0.30 Thank you very much
in advance. Manuel De : Manuel Daconceicao
[mailto:daconceicao@matriciel.be] Dear TRNSYS Users I’ve got a 20 zones project. But
there is an error message and trnsys can’t run. Here is the message 4: *** Fatal Error at time
: 4344.000000 Generated by
Unit : Not applicable or not available Generated by
Type : Not applicable or not available TRNSYS
Message 4 : The total number of OUTPUTS in your
simulation exceeds the maximum possible number of TRNSYS outputs. You can
either decrease the number of OUTPUTS in your simulation or you may increase
the maximum number of OUTPUTS that TRNSYS will accept by modifying that
parameter nMaxOutputs in the file TrnsysConstants.f90. You will need to
recompile and relink the trndll.dll Reported
information : Error 4 I can’t decrease the number of
OUTPUTS in my simulation so how can I make the change in the file
TrnsysConstants.f90 and recompile the trndll.dll ? Thanks in advance. Manuel da Conceição Nunes |