Hi all,
I've a TRNsys schema with basic time step 1 hour. In consequence of convergence problems I've set in Control Cards the simulation time step to 0.125, resulting in 8 simulations per hour. And also 8 lines per hour to my output files.
Now I want to have 1 resulting line per hour. E.g. the mean value of the 8 intermediate values. How can I do that?
Thanks for help
Henk
|