Dear Hermann,
if you use Building Type 56b (without standard output files) you won't have any problems.
Best regards,
Nadine
Schüco International KG
Entwicklung Technik Solar i.A. Dipl.-Ing. Nadine Hanke
Tel.: 0521/ 783-7338
Fax: 0521/783-9247 >>> "Diego A. Arias" <daarias@wisc.edu> 23.05.2007 16:47 >>> Hi Hermann, If you have a building in your simulation it can only simulate up to 5 years. Sorry for this inconvenience. We have added this to the list of future enhancements. Best regards, Diego Hermann Schranzhofer wrote: > Hi, > > we tested long time simulation with TRNSYS 16.1 and found that it is not possible to run a simulation for more than 5 years. Has someone an idea why this is limited? > > Thanks for answers. > > Best regards > Hermann. > > _______________________________________________________________ > > DI Dr. mont. Hermann Schranzhofer > Institut fuer Waermetechnik / Institute of Thermal Engineering > TU Graz / Graz University of Technology > Inffeldgasse 25 / B, A-8010 Graz > > Tel.: +43 316 873 7314 > Fax : +43 316 873 7305 > http://www.iwt.tugraz.at/ > _______________________________________________________________ > > > _______________________________________________ > TRNSYS-users mailing list > TRNSYS-users@engr.wisc.edu > https://www.cae.wisc.edu/mailman/listinfo/trnsys-users > -- Diego A. Arias TRNSYS Coordinator Solar Energy Laboratory University of Wisconsin - Madison 1500 Engineering Drive Madison, WI 53706
Schüco International KG Sitz der Gesellschaft und Registergericht: Bielefeld Handelsregister: HRA 8135 |