Like this ? Jamyangpalden wrote:
Dear all,Thanks for your advise. However, I tried using Type 14 Forcing function, still it did not work. The problem is very simple...I need to simulate two loads everyday from 7 am to 7 PM through the year. That is switch on first load at 7 am in the morning and switch off by 1 PM in the afternoon. At the same time switch on second load at 1 PM and switch off at 7 PM in the evening. This should repeat every day by itself without manual operation. Can anyone help with this.Thanks in advance _______________________________________________ TRNSYS-users mailing list TRNSYS-users@engr.wisc.edu https://www.cae.wisc.edu/mailman/listinfo/trnsys-users
-- / \____ Werner Keilholz, Software Development Group Leader \____/ CSTB Sophia Antipolis, SAIL / \____ s-mail: BP 209, 06904 SOPHIA ANTIPOLIS, F R A N C E \____/ phone: +33 (0)4 93 95 67 00 -- fax: +33 (0)4 93 95 67 33 / \____ Mailto:werner@cstb.fr -- ASPAM=antispamwpk42 \____/ http://evl.cstb.fr/english/team/WK/werner.htm Don’t surrender to SPAM ! http://werner.keilholz.free.fr/aspam/doc/Index.htm
Attachment:
loads.zip
Description: Zip archive