[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[TRNSYS-users] Simulation,
Dear all,
Thanks for your advise. However, I tried using Type 14 Forcing function,
still it did not work. The problem is very simple...I need to simulate two
loads everyday from 7 am to 7 PM through the year. That is switch on first
load at 7 am in the morning and switch off by 1 PM in the afternoon. At the
same time switch on second load at 1 PM and switch off at 7 PM in the
evening. This should repeat every day by itself without manual operation.
Can anyone help with this.
Thanks in advance