Dear all TRNSYS user,

 

Hi,

 

I have two questions about estimating the size of HVAC system of a building.

 

My 1st question:

As you know, there is a good explanation in 09-Tutorial document regarding estimating the size of HVAC equipment of a building by using the printegrator component (setting its parameter #4 to 15 min and determining the peak 15-minute heating and cooling load for building). However, it is evident that the maximum 15-minute heating and cooling load for the building is highly dependent on the initial temperature of the building, which is set on TRNBuild. When starting a simulation, what should the initial temperature be?

 

My 2nd question:

How can I estimate the size of humidifier or dehumidifier in the HVAC equipment?

 

I’d be glad if someone could help me out.

 