[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [TRNSYS-users] Turning ON-OFF Active system



Łukasz,

  There aren't controls available within TRNBuild. Make the inlet temperature and flow rate to the active layer into inputs and then you can use whatever controls you like in the Studio to turn pumps and other devices on and off and thus control the temperature in the space. Make sure to use a short timestep (1-5 minutes) or the building will not stay reliably near its set points.

kind regards,

 David



On 07/31/2018 12:12, Łukasz Wątły via TRNSYS-users wrote:
Dear All,

I am writing to you, since I would like to ask if there is a possibility to control the Active Layer - radiant ceiling heating system so that I could trigger it on\off whenever the airnode temperature is below or above the certain limit? Is there an option to do it in TRNBuild?

I would be grateful for any guidance.

Thanks in advance for your reply.

Kind regards,
Lukasz Watly


_______________________________________________
TRNSYS-users mailing list
TRNSYS-users@lists.onebuilding.org
http://lists.onebuilding.org/listinfo.cgi/trnsys-users-onebuilding.org

-- 
***************************
David BRADLEY
Principal
Thermal Energy Systems Specialists, LLC
22 North Carroll Street - suite 370
Madison, WI  53703 USA

P:+1.608.274.2577
F:+1.608.278.1475
d.bradley@tess-inc.com

http://www.tess-inc.com
http://www.trnsys.com