[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[TRNSYS-users] Rankine cycle simulation by using CHP library TESS



Dear Someone, 

I use the CHP library to develop a model for Rankine cycle power plant. I use the Type 591C to simulate the high pressure stage turbine firstly. This HP stage turbine has two extraction steam, with extraction pressure at 54.41 and 34.62 bar, and the inlet pressure and temperature of this turbine is 167 bar and 537 C. When I put the paramaters of this turbine as the input into the Input sheet of this module, there is a mistake when I run this module. It shows that
 "TRNSYS Message 127: The current Unit has tried to access an Input value higher than the number of outputs for the Type. Reported information: Not available". 

This is no mistakes for the paramapers of steam turbine. What's the problem of my model? The attachment is the model. 

Looking fordward for your feedback. 

Best Regards,
Jiyun Qin



Attachment: SAPGSubTESS.tpf
Description: Binary data