Hello everyone,
I am designing a solar combisystem in TRNSYS and when I run the simulation, at around 260 hrs, it stops and shows the error " Invalid floating point operation". I encounter this problem, when I run the whole year data but if I simulate it week by week by it is fine in the above time step.
Could you please recommend me the solution for this. If need be I can send the trnsys file as well.
Please find the attached online plotter snapshots showing how in one simulation it stops and in another simulation it does not.
Thanks,
Bishan Thapa