[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[TRNSYS-users] Ventilation schedule



Hi,

I would like to contact you about a question that i have regarding setting a ventilation schedule in the Type 56 of TRNSYS.

Indeed, i want to establish a simulation with air renewal scenarios in winter and also in summer.

In winter (Nov ---> April): the rate of air change is 1 vol/h from 8 a.m to 6 p.m

In summer (May ---> Oct): the air change rate is 4 vol/h, when the ambient temperature is lower than the air temperature inside the zone, otherwise the air exchange rate ventilation must be zero?

Please find enclosed the TPF of a single thermal zone in which i wrote the equation, but i do not know yet how to do this for the summer ventilation condition. 

Do you have any idea how to deal with this type of execution?

I appreciate your cooperation and thank you for your attention.

--
Kind Regards 
-----------
​Issam (Phd student)​

Attachment: Essai_ACH - Copie.rar
Description: application/rar