Nuha, I am not sure what data you are passing from Type9 to Type107 but Type107 does not take chiller load as an input. It takes the temperature and flow rate of three streams of water (the hot water (source energy) stream, the chilled water stream, and the cooling water stream). Unless you have made some computations outside of TRNSYS in order to convert the loads that you are reading with Type9 into a temperature and flow rate of chilled water returning from the load to the absorption chiller then the connection you have made needs to be revised. kind regards, David