[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[TRNSYS-users] Cooling load input



 

Hi

 

I have this problem and hope somebody can help me on this.  I have measured hourly cooling load data (8760 hrs) from existing building (via Building Automation System) and planning to use that data in TRNSYS as a building cooling load input. How is it possible to do that in TRNSYS?.

 

Thanks