[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[TRNSYS-users] Type2b



Hello,

 

After having read the documentation and online help, I am still having trouble with the type 2b and I was wondering if you could please help me out. My problem is the following:

I used the example file SDHW, where the Type2b is connected as follows:

Upper limit TH = solar collector output temperature

Lower limit TL = tank to heat source temperature

Monitoring temperature TIN = tank to load temperature

Upper deadband ΔTH = 15 degrees

Lower deadband ΔTL = 0 degrees

 

Then I went through the documented equations (Eq. 4.1-1 to Eq.4.1-4). However in the simulation results, when I take a look at time steps 4064.25 to 4065 (as an example), I find the following:

Time step

4064.25

4064.5

4064.75

4065

(TH-TL)   

-1.373

7.008

1.618

2.304

γi

0

0

0

1

γo

0

0

1

1

 

From what I see, time step 4064.75 does not agree with Eq. 4.1-3 since (TH-TL) is still below the upper deadband even though the controller is turned on (it should remain off until (TH-TL) is greater than or equal to the upper deadband). Maybe I am misreading the input/output controller values?

 

Any help would be greatly appreciated.

Thanks,
Ciaran