[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[TRNSYS-users] Changing start time e.g. in RadiationProcessing.tpf



Dear Trnsys Users,

 

I get an error when I change the start time of a file including a Type 9-Type 16 radiation processing combination (as e.g. in the Trnsys example file RadiationProcessing.tpf).

 

Everything works fine with ‘Simulation Start Time = 0 hr”

 

But with ‘Simulation Start Time = 1 hr” I get an error at hour 9 of the simulation

*** Fatal Error at time   :         9.000000

    Generated by Unit     :     4

    Generated by Type     :    16

    Message               : The simulation timestep is greater than the data timestep for the radiation calculation.  The simulation timestep needs to be reduced.

 

And with ‘Simulation Start Time = 12 hr” I get the error :

*** Fatal Error at time   :        13.000000

    Generated by Unit     :     4

    Generated by Type     :    16

    Message               : The simulation time is outside the data reading interval. If you are using a combination of Type9 and Type16, make sure that Type9 outputs 99 and 100 are connected to the appropriate Type16 inputs.

 

Does anyone has a suggestion?

 

Kind regards,

Maarten

 

 

---
PhD student
Simulation of Thermal Systems Research group
Departement Werktuigkunde-Department of Mechanical Engineering
Katholieke Universiteit Leuven
Celestijnenlaan 300A bus 2421
3001 Heverlee (Leuven)
T : 0032 (0)16 32 28 73
F : 0032 (0)16 32 29 85
E :
Maarten.Sourbron@mech.kuleuven.be