[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [TRNSYS-users] TRNFLOW'S large openig and Ventilation in TRNBUILD



Wang,

read section 3.1. (TRNFLOW main window) in the TRNFlow manual: there it is explained that "As soon as TRNFLOW is turned on, (...) in the simulation the defined infiltrations, ventilations and couplings will be replaced with the calculated air flows."

Best regards,
Angela

--
Graz University of Technology
Institute of Thermal Engineering
Inffeldgasse 25/B, A-8010 Graz, Austria
Tel.: (+43) 316 873 7307
Fax: (+43) 316 873 7305
http://www.iwt.tugraz.at



Am 09.02.2011 16:13, schrieb 王洋:
Dear all,
I have a queation about TRNFLOW'S large openig and Ventilation in TRNBUILD:

  If I defined TRNFLOW'S large openig and Ventilation in TRNBUILD,
How can both of them work? Can they both have influences on each other? What does the QVENT include? Only Ventilation in TRNBUILD or both of them? What does the FLVSZ include? Only TRNFLOW'S large openig's Ventilation?

Many thanks!

br.

wang