Wang,
  Information of this kind can be found in the TRNBuild / Type56 documentation (volume 05 in the Trnsys17 documentation set).
Kind Regards,
 David

On 12/17/2010 07:22, 王洋 wrote:

Dear all,
 
     I have a question about room air temperature: NTYPE 1: TAIR. As we know, there are different room air temperature in different height of one room. Besides that,  the wall, the floor and roof temperature of the room are also not the same. Please tell me  what's meaning of NTYPE 1: TAIR? Where is This AIRNODE? How to define This AIRNODE?
 
 PLUS: to Operative(operation) temperature of room:  How to define it?  What' meaning is  Operative(operation)temperature of room? What's difference of Operative(operation) temperature of room and  NTYPE 1: TAIR?
 
 
Many thanks!
 
Br.
 
wang
 
 
 
2010/12/17 <trnsys-users-request@cae.wisc.edu>
Send TRNSYS-users mailing list submissions to
       trnsys-users@cae.wisc.edu

To subscribe or unsubscribe via the World Wide Web, visit
       https://www-old.cae.wisc.edu/mailman/listinfo/trnsys-users
or, via email, send a message with subject or body 'help' to
       trnsys-users-request@cae.wisc.edu

You can reach the person managing the list at
       trnsys-users-owner@cae.wisc.edu

When replying, please edit your Subject line so it is more specific
than "Re: Contents of TRNSYS-users digest..."

Today's Topics:

  1. Re: Type 56 (David BRADLEY)
  2. Re: Psychrometrics (David BRADLEY)
  3. Re : Re:  Psychrometrics (Jérôme Deroche)
  4. error when opening sketchup (Annie Marston)


---------- 已转发邮件 ----------
From: David BRADLEY <d.bradley@tess-inc.com>
To: Abduljalil Ali Al-Abidi <abo_anas4@yahoo.com>
Date: Thu, 16 Dec 2010 12:47:43 -0600
Subject: Re: [TRNSYS-users] Type 56
Abduljalil,
  In order to change the wall layers, open TRNBuild and open your building description file (*.bui or *.b17). Select Typemanager: Walls from the menus at the top of the screen. Select the appropriate wall from the drop-down list. Double click on a layer in order to change its thickness.
Best,
 David


On 12/16/2010 03:26, Abduljalil Ali Al-Abidi wrote:
Dear Trnsys user
I am a new trnsys user and I want to change the thickness of the wall insulation in the tape 56 ( multi-zone building ). Is it possible to change this thickness in this type ex. for insulation = 5 cm to 20 cm step 5cm.
I would like to study the effect of insulation thick to the performance of the system
best regards

_______________________________________________ TRNSYS-users mailing list TRNSYS-users@cae.wisc.edu https://www-old.cae.wisc.edu/mailman/listinfo/trnsys-users

-- 
***************************
David BRADLEY
Principal
Thermal Energy Systems Specialists, LLC
22 North Carroll Street - suite 370
Madison, WI  53703 USA

P:+1.608.274.2577
F:+1.608.278.1475
d.bradley@tess-inc.com

http://www.tess-inc.com
http://www.trnsys.com


---------- 已转发邮件 ----------
From: David BRADLEY <d.bradley@tess-inc.com>
To: "Jérôme Deroche" <deroche.jerome@cedre-sophia.com>
Date: Thu, 16 Dec 2010 12:50:55 -0600
Subject: Re: [TRNSYS-users] Psychrometrics
Jérôme,
  What is most likely happening is that at a pressure of 1atm, your combination of the dry bulb temperature and the absolute humidity ratio are on the wrong side of the saturation line. Since that is physically impossible, the psychometric routine  keeps your dry bulb temperature and resets the absolute humidity ratio to the value it would be if the relative humidity were 100%.
Best,
 David


On 12/16/2010 04:21,  wrote:
Hello,
i'm using a psychrometrics type with dry bulb temperature and absolute humidity ratio in inputs. Pressure input is set to 1 atm.

I have noticed that sometimes there is a difference between the input humidity ratio and the output humidity ratio. The difference ratio is about 1 to 12%.

Could someone explain to me why this difference happens?

Thank you

Jérôme DEROCHE
Ingénieur d'études

CEDRE

Tel: 04 92 96 03 77
Port: 06 25 11 21 93
Ophira 1, 1 place Bermond
06560 SOPHIA-ANTIPOLIS

_______________________________________________ TRNSYS-users mailing list TRNSYS-users@cae.wisc.edu https://www-old.cae.wisc.edu/mailman/listinfo/trnsys-users

-- 
***************************
David BRADLEY
Principal
Thermal Energy Systems Specialists, LLC
22 North Carroll Street - suite 370
Madison, WI  53703 USA

P:+1.608.274.2577
F:+1.608.278.1475
d.bradley@tess-inc.com

http://www.tess-inc.com
http://www.trnsys.com


---------- 已转发邮件 ----------
From: "Jérôme Deroche" <deroche.jerome@cedre-sophia.com>
To: David BRADLEY <d.bradley@tess-inc.com>
Date: Fri, 17 Dec 2010 05:08:17 -0500 (EST)
Subject: [TRNSYS-users] Re : Re: Psychrometrics
Your answers are right.
Thank you very much



Jérôme DEROCHE
Ingénieur d'études

CEDRE

Tel: 04 92 96 03 77
Port: 06 25 11 21 93
Ophira 1, 1 place Bermond
06560 SOPHIA-ANTIPOLIS


Message original Re : Re: [TRNSYS-users] Psychrometrics

De : David BRADLEY <d.bradley@tess-inc.com>
A : Jérôme Deroche <deroche.jerome@cedre-sophia.com>
Date : 2010-12-16 19:51:05


Jérôme,
  What is most likely happening is that at a pressure of 1atm, your combination of the dry bulb temperature and the absolute humidity ratio are on the wrong side of the saturation line. Since that is physically impossible, the psychometric routine  keeps your dry bulb temperature and resets the absolute humidity ratio to the value it would be if the relative humidity were 100%.
Best,
 David


On 12/16/2010 04:21,  wrote:
Hello,
i'm using a psychrometrics type with dry bulb temperature and absolute humidity ratio in inputs. Pressure input is set to 1 atm.

I have noticed that sometimes there is a difference between the input humidity ratio and the output humidity ratio. The difference ratio is about 1 to 12%.

Could someone explain to me why this difference happens?

Thank you

Jérôme DEROCHE
Ingénieur d'études

CEDRE

Tel: 04 92 96 03 77
Port: 06 25 11 21 93
Ophira 1, 1 place Bermond
06560 SOPHIA-ANTIPOLIS

_______________________________________________ TRNSYS-users mailing list TRNSYS-users@cae.wisc.edu https://www-old.cae.wisc.edu/mailman/listinfo/trnsys-users

-- 
***************************
David BRADLEY
Principal
Thermal Energy Systems Specialists, LLC
22 North Carroll Street - suite 370
Madison, WI  53703 USA

P:+1.608.274.2577
F:+1.608.278.1475
d.bradley@tess-inc.com

http://www.tess-inc.com
http://www.trnsys.com


---------- 已转发邮件 ----------
From: Annie Marston <A.Marston@eb-engineers.com>
To: "trnsys-users@cae.wisc.edu" <trnsys-users@cae.wisc.edu>
Date: Thu, 16 Dec 2010 14:30:35 +0000
Subject: [TRNSYS-users] error when opening sketchup

Hi,

 

I am using the TRNSYS 3d plugin for SketchUp V7. I have v8 but the plugin doesn’t seem to attach to v8 (is this correct? Is there a plugin for v8). Whenever I open sketch up I get the following error:

Sorry… the plugin has encountered an error. This error may cause unpredictable behavior in the plugin continue this session with caution! It would probably be a good idea to exit SketchUp  and start again. (unfortunately this happens everytime I open sketchup)

 

For help please contact…

 

Error:

NameError

Wrong constant name jectinfoInterface

 

Backtrace:

C:/Program Files (x86)/Google/Google SketchUp 7/Plugins/Trnsys3d/lib/DialogManager.rb:31:in `const_get'

C:/Program Files (x86)/Google/Google SketchUp 7/Plugins/Trnsys3d/lib/DialogManager.rb:31:in `restore_state'

C:/Program Files (x86)/Google/Google SketchUp 7/Plugins/Trnsys3d/lib/DialogManager.rb:31:in `initialize'

C:/Program Files (x86)/Google/Google SketchUp 7/Plugins/Trnsys3d/lib/AsynchProc.rb:13:in `call'

 

 

My version of the plugin is 1.0.5.362

 

Can you help

 

Thanks

Annie

 

Dr. A. Marston, Ph.D. LEED® AP

Building Performance Analyst

 

Ebert & Baumann Consulting Engineers, Inc.

An  Enterprise  of  the  Ebert-Consulting Group

 

734 15th Street, NW

Suite 1000

Washington, D.C. 20005, USA

Tel          +1.202.608.1334

Fax         +1.202.544.1434

 

a.marston@eb-engineers.com

 


_______________________________________________
TRNSYS-users mailing list
TRNSYS-users@cae.wisc.edu
https://www-old.cae.wisc.edu/mailman/listinfo/trnsys-users


_______________________________________________ TRNSYS-users mailing list TRNSYS-users@cae.wisc.edu https://www-old.cae.wisc.edu/mailman/listinfo/trnsys-users

-- 
***************************
David BRADLEY
Principal
Thermal Energy Systems Specialists, LLC
22 North Carroll Street - suite 370
Madison, WI  53703 USA

P:+1.608.274.2577
F:+1.608.278.1475
d.bradley@tess-inc.com

http://www.tess-inc.com
http://www.trnsys.com