Dear Salim, These inputs are used
only if you check “Natural ventilation” in step 5 and “Cooling”
in step 6. They allow to control
additional, temperature controlled ventilation (step 5) and the cooling
setpoint (step 6). I think you may not have
the latest update of TRNSYS, as these variables CCONT_NAT is now called ‘CNAT_’ Werner De : salim mokraoui
[mailto:salim.mokraoui@lermab.uhp-nancy.fr] Dear
Sir, I’m new user of TrnSys. My question is : when creating a new
multi-zone project with the building wizard, what does CCONT_NAT and T_COOL_ON
inputs (created automatically) mean ? Best regards |