[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [TRNSYS-users] Gains in a building



1. Define a new input variable in PREBID (click on the "Inputs" Button at the project window; click on "add" ...)
2. Use the new variable for e.g. GAINS; open the gains type manager window; click on one of the blue arrows -> dialog opens; choose "Input" and enter your new variable.
3. The new variable should be available in IIsibat or in your deck so you can use a data reader for your real data and connect the output with the new
Input variable of PREBID.

Have a lot of fun
Hermann Schranzhofer


_______________________________________________________________

 DI Dr. mont. Hermann Schranzhofer
 Institut fuer Waermetechnik / Institute of Thermal Engineering
 TU Graz / Graz University of Technology       
 Inffeldgasse 25 / B, A-8010 Graz      

 Tel.: +43 316 873 7314
 Fax : +43 316 873 7305
 http://www.iwt.tugraz.at/
_______________________________________________________________

  
________________________________________
Von: Nicolas Heijmans [mailto:nicolas.heijmans@bbri.be] 
Gesendet: Donnerstag, 16. August 2007 13:31
An: trnsys-users@engr.wisc.edu
Betreff: [TRNSYS-users] Gains in a building

Hello,

I have TRNSYS 15.

I use PREBID.

I would like to know if it is possible to specify GAINS (or other controls such as VENTILATION.) with an input file, instead of a constant value, an input or a schedule. 

I have real data; I want to calibrate my model with those data. The actual gains do not follow a DAY or WEEK schedule.

Thanks,

Kind regards,

Nicolas Heijmans
 
Belgian Building Research Institute 
http://www.bbri.be 
Av. P. Holoffe 21, B-1342 Limelette, Belgium
tel. : + 32 2 655 77 87 fax : + 32 2 653 07 29

Have a look to the SAVE EPLAPBEL project: http://www.eplabel.org

Attachment: Hermann Schranzhofer.vcf
Description: Binary data