[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[TRNSYS-users] Error 114



Hello:

 

  I have a problem with a system in which I have an absorption chiller and a cooling tower. When I run the simulation, it finishes because of Error 114 (incompatibility between the dry and the wet bulb temperatures in the cooling tower). I would like to know how must I connect them. I have connected Type 109 with Type 33 (Tªambient>Dry bulb temperature and relative humidity>percent relative humidity) and after that Type 33 to the cooling tower (Wet bulb temperature and Dry bulb Temperature). Could you tell me something about this???????

 

  Thanks a lot